Tutorial 211 explains how to draw a rectangle on a chart between two times with the highs and lows set to be the Ahighest high and the lowest low during the period between the two times. A second rectangle is drawn continuing the first rectangle to the end of the chart. The rectangles are drawn using a method.<br /><br />The tutorial also shows how to convert dates and time to DateTime format and how to created DateTime points.<br /><br />The tutorial program is able to draw rectangles for historical times that have already passed as well as future bars.<br /><br />See https://markplex.com/free-tutorials/tutorial-211-drawing-a-rectangle-between-2-times-and-the-highest-and-lowest-price-between-those-time/